Centralised Maintenance Management System
Eliminated unplanned downtime across distributed generator fleet
Industry
Power Industry
Project Type
Enterprise Platform
Year
2024
Stack
4 technologies
A large power utility operating multiple generator sites faced growing operational risk from manual, paper-based maintenance workflows. Faults were being missed, schedules were inconsistent, and there was no unified view across sites. We were brought in to build a system that would bring order to a fragmented, high-stakes environment.
- 01
No single source of truth for maintenance schedules across distributed sites
- 02
SCADA systems at each site operated in silos with no integration layer
- 03
Field teams relied on spreadsheets, leading to missed preventive tasks
- 04
Management had no real-time visibility into asset health or maintenance status
Automated scheduling engine with SCADA integration, role-based dashboards, and real-time email alerting for proactive maintenance.
Zero unplanned downtime incidents in the 12 months post-deployment
Maintenance task completion rate increased from 61% to 97%
Automated scheduling reduced administrative overhead by 40%
Real-time dashboards adopted by operations teams across all sites
Project Details
Industry
Power Industry
Type
Enterprise Platform
Year
2024
Reference ID
CMMS
Tech Stack
Frontend
Backend
Database
Infrastructure
Ready to build?
Start a similar project